A fog screen at an exhibition entrance stops people in a way no banner does: a logo floating in mid-air, and visitors walking straight through it. But the effect only works if the planning is done properly — the width, the truss, the water supply, the projector, and the venue all have to be decided before the machine is ordered. This guide is the checklist we would use for an exhibition installation, so nothing is discovered on show day.
The 10-Item Planning Checklist
- Venue and installation width — measure the opening, not the booth: the screen width comes from the space, not the machine.
- Mounting — truss or permanent mount? Confirm the ceiling height and who supplies the truss.
- Water — supply and drainage, and the tank run time for your show hours.
- Projector — space, sightlines, and image size; confirm whether it is included in the quote.
- Content — bright, high-contrast images with bold shapes; fine text washes out on mist.
- Ambient light and background — a dark background and controlled venue lighting read best.
- Ambient airflow — check for air-conditioning vents and open doors near the screen.
- Power — the machine’s supply and the projector’s supply, and their positions.
- Foot traffic — keep the walk-through route clear and the machine out of the path.
- Timeline — order, delivery, installation, and testing before the doors open.
How Wide Should the Fog Screen Be?
The width comes from the space, not from the machine. A 1 m screen suits a narrow entrance or a product reveal; a 2 m screen covers a standard booth entrance; a 3 m screen makes an impact across a wide opening. The AVDIV FC Series covers 1–3 m in four models — FC-100, FC-200, FC-250, and FC-300 — and each model has its own atomizer count, water consumption, and weight, so the choice of width is also a choice of rigging and water supply. The models are compared on the fog screen page. For an opening wider than 3 m, more than one machine is used side by side, and the span is planned as one installation — say so in the enquiry, so the quote covers the full span and the truss to hold it.
Truss or Permanent Mount?
For a trade show that lasts a few days, the answer is almost always a truss: it goes up fast, comes down fast, and is built to the height of the hall. The beam length, pillar height, and base are specified for your venue — the dimensions on the truss page are reference examples, and the final configuration is confirmed for your site. For a museum or a venue that runs the same installation for months, a permanent mount is worth discussing: it is planned with the venue, and the water, power, and projector positions are fixed once. Either way, the mounting plan should be confirmed before the machine is ordered, not after it arrives. For the full installation sequence — mounting, water supply, projector placement, and routine maintenance — see our installation guide.
Water, Power, and Maintenance
Water supply and drainage
The machine uses tap water — no chemicals — and consumption runs from 8–10 litres per hour on the FC-100 to 12–15 litres per hour on the FC-300. The venue needs to provide a water supply and a drainage point, or the machine runs from its tank. Tank run time depends on the model, the usable water volume, and operating conditions, so confirm it against your show hours: a tank that runs dry at midday is a problem that should have been solved in planning.
Power
Confirm the power supply for the machine and the projector, and where the sockets are. Both need to be within reach of the installation, and the cable runs should be planned so they do not cross the walk-through route.
Routine maintenance
A fog screen needs little day-to-day attention: check the water level, check the atomizers, and keep the area around the machine clear. The machine is serviced between events, not during them. If the exhibition runs for several days, agree who checks the water each morning — the exhibitor or the installer.
What if it stops working on show day?
Have the installer’s contact to hand and a plan for a quick check: water level first, then power, then the projector. Most show-day problems are one of those three. This is also why installation and a test run the day before opening are part of the plan, not an optional extra.
The Timeline: From Enquiry to Show Day
- Enquiry: send the venue type, the available installation width, the delivery country or city, and the project date — plus a venue drawing or photo if the layout is unusual.
- Quote: the machine, the truss, the freight, and the installation quoted as one document, with the model confirmed.
- Order: confirm the model, the truss configuration, and the delivery date; arrange the venue’s rigging and power.
- Delivery: the machine and truss arrive at the venue or the installer’s warehouse.
- Installation: the truss is built, the machine is mounted, the water and power are connected, and the projector is positioned.
- Test: the image is projected, the content is checked, the walk-through route is walked, and the ambient light and airflow are checked on site — the day before the doors open, not the morning of.
Common Mistakes to Avoid
Five mistakes appear again and again: ordering the machine before the venue width is measured; forgetting the projector in the budget; choosing fine, pale text for the content; placing the screen next to an air-conditioning vent; and skipping the test day. Each one is cheap to prevent in planning and expensive to fix on show day.
How long does it take to install a fog screen at an exhibition?
The machine itself installs quickly once the truss is up — the time goes into the truss, the water and power connections, and the projector alignment. Allow a full day before opening for installation and testing, not a few hours on the morning of the show.
Do I need a projector, or is one included?
A projector is normally separate from the machine and is priced separately. Confirm whether your quote includes one, and which model — the image size, ambient light, and throw distance decide what you need.
Can a fog screen be used in a dark hall?
A dark hall is ideal: the image reads best against a dark background, and controlled venue lighting helps the mist curtain stand out. Bright daylight and strong ambient light wash the image out.
What happens if someone walks through the screen during the show?
Nothing breaks. The mist parts around the person and reforms behind them, and the image continues. Walking through is the point — it is how visitors enter, and it is why fog screens are used for entrances and brand reveals.
How much space do I need behind the fog screen?
Enough for the machine and the projector, plus a clear walk-through route. The exact depth depends on the model and the projector’s throw distance — share your venue plan when you request a quote so the layout can be confirmed.
Request a quote for your exhibition or compare the FC Series models.